Days 23-24 – Framing begins…

A day and a half of framing work yields the basement walls and the first floor beams, as seen in these photos. By the end of the day about a third of the floor joists were up and another bunch were cut to length.

From Rebuilding – Framing
From Rebuilding – Framing
From Rebuilding – Framing

Leave a Reply